Joint activities

The following activity outlines are draft document that will evolve over time as the projects progress.

SRA Key TopicSRA TopicSRA Topic priority
Technical feasibility and long-term performance of repository components (Topic 3 in the SRA)
  1. Full scale demonstration of plugging and sealing (Topic 3.6 in the SRA)
  2. Description of seals and plugs systems and modelling of their long-term behaviour, with assessment of the consequences on long-term safety (Topic 3.10 in the SRA)
  3. Salt backfill (Topic 3.14 in the SRA)
  1. High
  2. High
  3. Medium

Read more: JA2 : Full scale demonstration of Plugging & Sealing

SRA Key TopicSRA TopicSRA Topic priority
Waste form and their behaviours (Topic 2 in the SRA)

Release from ILW and their detailed characterization (Topic 2.2 in the SRA)

High

Read more: JA3 : Waste forms and their behaviour C14

SRA Key TopicSRA TopicSRA Topic priority
Monitoring (Topic 6 in the SRA)

Monitoring of the Environmental Reference State (Topic 6.3 in the SRA)

High

Read more: JA4 : Monitoring the Environmental Reference State

SRA Key Topic SRA Topic SRA Topic priority
Safety of construction and operations (Topic 5 in the SRA)
  1. Improved methodology, approaches and documentation on risk assessment, risk management, further documentation for reporting (Topic 5.1 in the SRA)
  2. Strategies to evaluate the impact of operational issues on the disposal system (long-term safety, design, costs…) (Topic 5.2 in the SRA)
  1.  High
  2. Medium

Read more: JA5 : Safety of construction and operations

SRA Key TopicSRA TopicSRA Topic priority
Safety case (Topic 1 in the SRA)  Increase the confidence in testing and further refinement of the tools used in safety assessments (Topic 1.1 in the SRA)  High

Read more: JA6 : Confidence increase in safety assessment codes : Material interaction

SRA Key Topic  SRA Topic SRA Topic priority
 Monitoring (Topic 6 in the SRA)
  1. Monitoring Strategies and programmes for performance confirmation of the repository (Topic 6.1 in the SRA)
  2. Availability of monitoring technologies and techniques (Topic 6.2 in the SRA)
  3. Monitoring of engineered barrier systems (EBS) during operation (Topic 6.4 in the SRA)
 High

Read more: JA7 : Monitoring programme

SRA Key TopicSRA TopicSRA Topic priority
Safety Case (Topic 1 in the SRA) Increase confidence in and further refinement of methods to make sensitivity and uncertainty analyses (Topic 1.3 in the SRA) Medium

Read more: JA8 : Safety Case: process model benchmarking

SRA Key TopicSRA TopicSRA Topic priority
Safety Case

Improve safety case communication on the short-term, transient and long-term aspects of geological disposal (Topic 1.2 in the SRA).

First action: Safety Case Peer review ORWG

High

Read more: JA9 : Efficient peer review and related QA processes

SRA Key TopicSRA TopicSRA Topic priority
Technical feasibility and long-term performance of repository components Long-term stability of bentonite in crystalline environments (Topic 3.9 in the SRA) High

Read more: JA10 : Long-term stability of bentonite in crystalline environments

SRA Key TopicSRA TopicSRA Topic priority
Technical feasibility and long-term performance of repository components (Topic 3 in the SRA) Develop a common report on the lessons learned from in-situ experiments on the behaviour of bentonite. (Topic 3.2 in the SRA) High/Medium

Read more: JA11 : Various Topics

 SRA Key Topic SRA TopicSRA Topic priority 
 Development Strategy of the repository (Topic 4 in the SRA)  Adaptation and optimization of the repository (Topic 4.1 in the SRA)  Medium

Read more: JA12 : Adaptation and optimisation of the repository

Read more: JA13 : Communicating result from RD&D

SRA Key TopicSRA TopicSRA priority
Cross-Cutting Activity 2 (CC2) Cross-cutting Activity: Competence Maintenance, Education and Training (CMET) High

Read more: JA14 : Competence Maintenance, Education and Training: CMET

Read more: JA15 : Nuclear Knowledge Management: NKM

Read more: JA16 : WMOs IEP (WMO 1-6)